File 94 of 119
Prev | Next

Share This
Url
Tag
Img
Thumb


20181108_204518.jpg | Hits: 160 | Posted on: 11/8/18 | View Low-Res

With the new sheaves, I could make the final adjustments on the cables so the lift is suspended ~3/16" above the column baseplates. That made it MUCH easier to position the columns so I could drill & set the anchor bolts. I also routed the air & hydraulic lines. Later, I may add wiring for LED strips in the runways.