File 12 of 20
Prev | Next

Share This
Url
Tag
Img
Thumb

trailer20l.jpg Then I doubled the cross beams by welding in identical 2x3x1/4" angle iron.  In the process, I also drilled a hole through each one's Left end (and a few other places along the side rails) for wiring.  I also replaced the missing RHR wheel cover, and added a central tongue jack.  But I haven't removed the old side-mounted jack yet, or repaired the tongue latch. I installed a prewired 7-blade connector with a box of binding posts to connect the trailer wiring, and welded on a few ground studs.  I also caged the taillights.
trailer20l.jpg | Hits: 149 | Posted on: 9/7/19 | View original size (7.59 MB)

Then I doubled the cross beams by welding in identical 2x3x1/4" angle iron. In the process, I also drilled a hole through each one's Left end (and a few other places along the side rails) for wiring. I also replaced the missing RHR wheel cover, and added a central tongue jack. But I haven't removed the old side-mounted jack yet, or repaired the tongue latch. I installed a prewired 7-blade connector with a box of binding posts to connect the trailer wiring, and welded on a few ground studs. I also caged the taillights.