File 125 of 133
Prev | Next

Share This
Url
Tag
Img
Thumb


20200315_205920.jpg | Hits: 140 | Posted on: 3/15/20 | View Low-Res

I still have to run the silicone vacuum lines; mount the charcoal canister, and install the plastic reservoir; but the engine is pretty much done. It passed the coolant pressure test, but the PSF needs to be topped-up after the engine runs.
IF THE IMAGE IS TOO SMALL, click it.

Still to do:
- horns
- fuel pump access
- pinion bearing preload
- ATF filter
- swingaway bushing