|
20200315_205920.jpg | Hits: 140 | Posted on: 3/15/20
| View Low-Res
I still have to run the silicone vacuum lines; mount the charcoal canister, and install the plastic reservoir; but the engine is pretty much done. It passed the coolant pressure test, but the PSF needs to be topped-up after the engine runs. IF THE IMAGE IS TOO SMALL, click it.
Still to do: - horns - fuel pump access - pinion bearing preload - ATF filter - swingaway bushing
|