4-back-view.jpg | Hits: 88 | Posted on: 6/29/24
| View original size (982.73 KB)
Driver's side header fully tacked up including the stub to the crossover pipe. I'll have to cut the tacks to the header to weld the stub first then weld the header to the flange last to have access for the TIG.