File 17 of 29
Prev | Next

Share This
Url
Tag
Img
Thumb

qft17.jpg Install the power valve into the primary metering block using the non-stick gasket from the rebuild kit.
qft17.jpg | Hits: 4594 | Posted on: 1/16/07 | View original size (423.91 KB)

Install the power valve into the primary metering block using the non-stick gasket from the rebuild kit.